Construction Cash Flow Management

Construction Cash Flow Management: Surviving Payment Delays & Retention

Construction Cash Flow Management: Surviving Payment Delays & Retention | CFO IQ

Construction Cash Flow Management: Surviving Payment Delays & Retention

Expert Strategies for Navigating Progress Billing, Retention Release, and Payment Timing Challenges

Introduction to Construction Cash Flow Challenges

Construction cash flow management represents one of the most critical yet challenging aspects of running a successful construction business. Unlike traditional retail or service businesses where payment typically occurs at the point of sale, construction companies face unique timing challenges that can make or break their operations. The industry's inherent payment structure—characterized by progress billing, retention holdbacks, and extended payment terms—creates a cash flow environment that demands sophisticated financial management strategies.

The construction industry operates on what financial experts call a "negative cash conversion cycle," where businesses must invest significant capital upfront for materials, labor, and equipment long before receiving payment from clients. This fundamental mismatch between cash outflows and inflows creates a precarious financial position for contractors of all sizes. According to industry research, cash flow problems cause more construction business failures than lack of profitability, underscoring the critical importance of mastering construction cash flow management.

Payment delays compound these challenges exponentially. When a general contractor waits 30, 60, or even 90 days for payment from a client, while still needing to pay subcontractors and suppliers within 15-30 days, the resulting cash crunch can paralyze operations. Retention holdbacks—typically 5-10% of each progress payment held until project completion—further strain working capital. For many construction firms, especially small to mid-sized operations, a single delayed payment on a major project can trigger a domino effect that threatens the entire business.

Struggling with Construction Cash Flow Issues?

Let CFO IQ help you implement proven strategies to stabilize your cash flow and grow your construction business sustainably.

Understanding Construction Cash Flow Dynamics

To effectively manage construction cash flow, you must first understand the unique financial dynamics that distinguish construction from other industries. The construction business model creates several inherent cash flow challenges that require specialized management approaches.

The Construction Cash Flow Cycle

The typical construction cash flow cycle follows this pattern: project bidding and contract award, mobilization and initial material purchases, ongoing work with periodic billing, payment receipt after billing delays, retention holdback until completion, and finally retention release after the defects liability period. Each stage presents distinct cash flow challenges that must be anticipated and managed.

Typical Cash Flow Timeline on Construction Projects

40% Week 1-2
Mobilization
65% Week 3-4
Materials
85% Week 5-8
Active Work
55% Week 9-12
First Payment
75% Month 4-6
Progress Billing
90% Completion
Final Bill

Key Cash Flow Pressure Points

Construction companies face several critical pressure points that can strain cash flow. Project startup costs represent the first major challenge, as contractors must often purchase materials, mobilize equipment, and begin paying labor before receiving any payment from clients. Many contracts require 10-20% progress completion before the first billing is eligible.

Cash Flow Pressure Point Typical Impact Duration Mitigation Strategy
Project Mobilization 15-25% of project value 2-4 weeks Negotiate advance payments
Material Procurement 30-40% of project value Ongoing Supplier credit terms, factoring
Payment Delays 30-90 day lag Throughout project Progress billing, acceleration clauses
Retention Holdback 5-10% of total value 3-12 months post-completion Retention bonds, early release negotiation
Subcontractor Payments 50-70% of project costs Weekly/bi-weekly Back-to-back payment terms

Progress Billing: Your First Line of Defense

Progress billing represents the foundation of effective construction cash flow management. This billing methodology allows contractors to invoice clients periodically throughout a project based on work completed, rather than waiting until project completion. When implemented correctly, progress billing significantly reduces the cash flow gap between expenditures and revenue recognition.

Structuring Effective Progress Billing Schedules

The structure of your progress billing schedule can make a dramatic difference in your cash flow position. Most construction contracts establish billing frequency—typically monthly, but potentially bi-weekly or even weekly for larger projects. The key is negotiating the shortest billing cycle that your client will accept, as this accelerates cash inflows and reduces your working capital requirements.

Pro Tip: Front-load your progress billing schedule when possible. Rather than billing strictly based on percentage completion, negotiate billing schedules that recognize mobilization costs, material purchases, and equipment deployment earlier in the project timeline. This approach improves cash flow during the critical early stages when your capital is most stretched.

Documentation Requirements for Progress Billing

Successful progress billing depends on meticulous documentation. Each billing submission should include detailed records of work completed, materials incorporated, labor hours expended, and percentage completion calculations. Many clients require supporting documentation such as photographs, daily logs, material delivery receipts, and certified payroll records. The more comprehensive and professional your billing documentation, the faster your invoices will be processed and paid.

Common Progress Billing Methods

Construction companies can utilize several progress billing methods depending on contract type and client requirements:

  • Percentage of Completion: Bills based on overall project completion percentage, calculated using cost-to-cost or other recognized methods
  • Cost-Plus Billing: Invoices actual costs incurred plus agreed markup, providing excellent cash flow alignment with expenses
  • Milestone Billing: Triggers payment upon achieving specific project milestones, requiring careful milestone definition
  • Time and Materials: Bills for actual time and materials used, common in change order work and repair projects
  • Unit Price Contracts: Invoices based on measurable units completed (cubic yards, square feet, etc.)

For optimal cash flow management, many contractors advocate for the cost-plus or time-and-materials approaches, as these most closely align billing with actual cash expenditures. However, client preferences and competitive considerations often dictate the billing method, requiring contractors to adapt their cash flow strategies accordingly. When working with milestone-based contracts, negotiate milestone definitions that occur frequently and early in the project to improve cash flow timing.

Need Help Optimizing Your Progress Billing Strategy?

CFO IQ specializes in helping construction firms implement billing systems that maximize cash flow while maintaining client relationships.

Navigating Retention Release Challenges

Retention holdbacks represent one of the most significant cash flow challenges in construction. Clients typically withhold 5-10% of each progress payment as security against defects, incomplete work, or contractor default. While retention protects clients, it creates substantial working capital pressure for contractors, particularly on long-duration projects or when managing multiple projects simultaneously.

Understanding Retention Mechanics

Standard construction contracts establish retention percentages (typically 5-10%), maximum retention caps (often 5% of total contract value), and release conditions. Retention typically consists of two phases: practical completion retention (often 50% released upon substantial completion) and final retention (released after the defects liability period, typically 6-12 months post-completion). This extended timeline means contractors may wait 18-24 months from project start to receive final retention payments.

Retention Strategy Implementation Approach Cash Flow Impact Success Factors
Retention Negotiation Reduce percentage from 10% to 5% or lower High - Immediate improvement Strong track record, relationships
Retention Caps Cap total retention at fixed amount Medium - Helps on larger projects Contract negotiation leverage
Retention Bonds Substitute bond for cash retention High - Releases all retention Available bonding capacity, cost-benefit
Early Release Provisions Negotiate phased release schedule Medium - Accelerates partial payments Demonstrated performance, client trust
Retention Accounts Separate interest-bearing accounts Low - Minor interest income Contract provisions, regulatory environment

Strategies for Accelerating Retention Release

Progressive contractors employ several strategies to minimize retention's cash flow impact. The most effective approach is negotiating reduced retention percentages or elimination of retention entirely, particularly for repeat clients or when your firm has demonstrated reliable performance. Some contractors successfully negotiate retention caps that limit total retention to a fixed dollar amount regardless of project size.

Retention bonds offer another powerful strategy. Instead of the client holding cash retention, the contractor provides a retention bond (also called a retention guarantee or retention warranty) that guarantees the contractor's performance during the defects liability period. The client receives equivalent security while the contractor maintains access to working capital. While retention bonds carry a cost (typically 1-3% annually of the retention amount), the improved cash flow often justifies this expense, particularly on large projects.

Important Consideration: When evaluating retention bond costs against cash flow benefits, remember to factor in your cost of capital. If your business pays 8-12% for working capital financing, spending 1-3% for a retention bond that releases 5-10% of contract value creates significant value. This is especially true when managing multiple projects with substantial cumulative retention holdbacks.

Managing the Retention Release Process

Successful retention release requires proactive management. Maintain comprehensive project closeout documentation including as-built drawings, operation and maintenance manuals, warranties, test certificates, and training records. Schedule retention release claims to coincide with practical completion and final completion milestones. Many contractors leave significant retention unclaimed simply due to administrative oversight or incomplete documentation. Establishing a dedicated process for tracking and claiming retention releases ensures you recover these funds as quickly as contractually permitted.

Subcontractor Payment Timing Strategies

Managing subcontractor payment timing represents a critical balancing act in construction cash flow management. Subcontractors typically constitute 50-70% of total project costs for general contractors, making these payments the largest cash outflow on most projects. The timing mismatch between when you must pay subcontractors and when you receive payment from clients creates substantial working capital pressure.

Back-to-Back Payment Terms

Back-to-back payment terms, also called "pay-when-paid" or "pay-if-paid" clauses, attempt to align subcontractor payment timing with client payment timing. Under these arrangements, your obligation to pay subcontractors is contingent upon receiving payment from the client. While these provisions improve your cash flow position, their enforceability varies significantly by jurisdiction, and many regions have legislation prohibiting or restricting such clauses to protect subcontractors.

Establishing Equitable Payment Frameworks

Even where back-to-back payment terms are legally enforceable, relying heavily on such provisions can damage subcontractor relationships and increase your costs. Subcontractors price in the payment delay risk through higher bids, reduced quality, or reluctance to work with you on future projects. A more sustainable approach involves establishing clear, reasonable payment terms that balance your cash flow needs with fair treatment of subcontractors.

Subcontractor Payment Strategy Comparison

Payment Approach Typical Terms Contractor Cash Flow Impact Subcontractor Relationship Impact Best Use Case
Standard Net Terms Net 30 from invoice Higher working capital need Positive - builds loyalty Strong cash position, relationship focus
Extended Terms Net 45-60 days Improved working capital Neutral to negative Market standard practices
Back-to-Back Terms 7-14 days after client payment Optimal cash flow alignment Negative - increases costs High-risk projects, weak cash position
Milestone-Based Upon completion of defined milestones Variable - depends on milestone frequency Neutral - clear expectations Long-duration phases
Early Payment Discounts 2/10 Net 30 Improved with discount offset Very positive when taken Good relationships, excess cash

Optimizing Subcontractor Payment Processes

Efficient subcontractor payment processing reduces administrative costs and improves relationships while maintaining cash flow control. Implement clear invoicing requirements including detailed work descriptions, time periods covered, supporting documentation requirements, and proper invoice submission procedures. Establish a consistent payment schedule so subcontractors know when to expect payment. Many general contractors implement weekly or bi-weekly payment runs, providing predictability that subcontractors value even if payment terms are extended.

Consider implementing electronic payment methods that provide better cash flow visibility and control. ACH transfers, for example, allow you to initiate payment on a specific date, maintaining funds in your account until the last possible moment. Some contractors offer early payment discounts (such as 2% for payment within 10 days) that incentivize subcontractors to accept longer standard terms while providing flexibility to improve your working capital position during cash flow crunches by taking the discount. Learn more about managing complex payment structures in our guide on margin optimization strategies.

Bridge Financing: Short-Term Liquidity Solutions

Bridge financing provides short-term funding to cover the gap between project expenses and client payments. For construction companies, bridge financing can mean the difference between seizing growth opportunities and turning away profitable work due to working capital constraints. Understanding various bridge financing options and their appropriate applications is essential for sophisticated construction cash flow management.

Traditional Bridge Financing Options

Several bridge financing structures serve construction company needs. Traditional bank lines of credit offer the most cost-effective solution, typically charging interest rates of 5-10% above base rates with minimal fees. However, banks generally require strong financial statements, established client relationships, and substantial collateral. Many construction companies struggle to qualify for traditional bank lines due to thin margins, project-based revenue fluctuations, or limited tangible assets.

Alternative Bridge Financing Sources

When traditional bank financing proves unavailable or insufficient, alternative lenders provide options albeit at higher costs. Asset-based lenders focus on accounts receivable and work-in-progress as collateral, offering greater flexibility than traditional banks. These lenders typically advance 70-85% of eligible receivables and charge interest rates of 10-20% annually plus origination fees. While more expensive than bank financing, asset-based lending provides faster approval and more flexible terms.

Bridge Financing Type Typical Cost Advance Rate Approval Time Best For
Bank Line of Credit 5-10% APR 75-85% of receivables 2-4 weeks Established companies, strong financials
Asset-Based Lending 10-20% APR 70-85% of receivables 1-2 weeks Growth companies, seasonal needs
Merchant Cash Advance 25-50% APR equivalent N/A - revenue based 1-3 days Emergency only, last resort
Equipment Financing 8-15% APR 75-90% of equipment value 1-2 weeks Equipment purchases, capital projects
Invoice Factoring 1.5-3% per month 80-90% of invoice value 2-5 days Specific project funding, fast growth

Strategic Use of Bridge Financing

Effective bridge financing use requires discipline and strategy. Bridge financing should fund temporary cash flow gaps, not replace adequate working capital. Use bridge financing to capture specific opportunities—securing materials for a profitable project, bridging payment delays on large contracts, or smoothing seasonal fluctuations. Avoid using bridge financing to cover operating losses or fund unprofitable work. The cost of bridge financing makes it unsuitable for long-term working capital needs. For more insights on strategic financial planning, explore our article on Series A financial preparation.

Cost Analysis Framework: Before utilizing bridge financing, calculate the all-in cost including interest, fees, and any collateral requirements. Compare this cost to the profit margin on the project being funded. Bridge financing makes sense when project margins exceed financing costs by a comfortable margin (typically 2-3x minimum). If financing costs consume most or all of project profits, reconsider whether the project truly benefits your business.

Construction Invoice Factoring

Invoice factoring represents a specialized form of bridge financing particularly well-suited to construction companies. Unlike traditional loans that create debt on your balance sheet, factoring involves selling your accounts receivable at a discount to a factoring company that then collects payment from your client. This transaction converts future cash flows into immediate working capital without creating debt obligations.

How Construction Factoring Works

Construction factoring follows a straightforward process. After completing work and submitting an invoice to your client, you submit that invoice to a factoring company for purchase. The factor advances 80-90% of the invoice value within 24-48 hours. When your client pays the invoice (to the factoring company), the factor remits the remaining 10-20% minus their fee (typically 1.5-3% for 30-day payment terms). This arrangement provides immediate cash flow while the factor assumes collection responsibility.

Construction-Specific Factoring Considerations

Construction factoring involves unique considerations compared to general invoice factoring. Progress billings, retention holdbacks, and mechanic's lien rights create complexities that require specialized factoring expertise. Not all factoring companies understand construction finance, making it essential to work with factors experienced in construction industry dynamics. Construction factors understand the importance of lien rights, priority of claims, and proper documentation required for enforceable receivables. For more on effective financial tracking, see our guide on creating effective financial dashboards.

Factoring Feature Recourse Factoring Non-Recourse Factoring
Cost 1.5-2.5% per month 2.5-4% per month
Bad Debt Risk Contractor retains risk Factor assumes risk
Advance Rate 85-90% of invoice value 80-85% of invoice value
Client Requirements Less stringent creditworthiness Strict creditworthiness standards
Best For Established client relationships New or higher-risk clients

Evaluating Factoring Economics

Factoring costs appear high on the surface—1.5-3% monthly can equate to 18-36% annually. However, this comparison misleads because factoring provides transaction-specific financing, not year-long borrowing. The relevant comparison is factoring cost versus profit margin on the specific project being financed. For example, if a project generates 20% gross margin and factoring costs 2%, the net impact is still a 18% margin while providing immediate cash flow.

Beyond direct cost comparison, consider factoring's strategic benefits. Factoring provides cash flow certainty, eliminating payment delay risks. The factor handles collections, reducing your administrative burden. Factoring doesn't appear as debt on your balance sheet, preserving bonding capacity and other credit facilities. For rapidly growing construction companies, factoring provides scalable financing that grows automatically with sales, unlike fixed credit limits on traditional facilities. To understand how technology can improve your financial operations, read about AI finance automation ROI.

Ready to Transform Your Construction Cash Flow?

CFO IQ has helped dozens of construction firms implement sustainable cash flow management systems. Let us show you how.

Cash Flow Forecasting and Monitoring

Proactive cash flow forecasting represents the cornerstone of effective construction cash flow management. Rather than reacting to cash crunches after they occur, sophisticated contractors forecast cash flows weeks and months in advance, allowing time to secure financing, adjust payment terms, or make operational changes before crises emerge.

Building a Construction Cash Flow Forecast

Construction cash flow forecasting requires project-level detail aggregated to company-wide projections. Start by creating detailed cash flow projections for each active project including expected billing dates and amounts, anticipated payment timing based on client history, required subcontractor and supplier payments, direct labor costs, equipment expenses, and overhead allocations. Project-level forecasts should extend from project start through final retention release.

Key Forecasting Components

Effective construction cash flow forecasts incorporate several critical components. Cash inflows include progress billing receipts with realistic payment delay assumptions, retention releases scheduled at appropriate milestones, change order payments, and any other revenue sources. Cash outflows encompass subcontractor payments tied to work completion, material supplier payments based on delivery schedules, direct labor payroll, equipment costs including rentals and purchases, overhead expenses, debt service, and tax obligations.

Forecasting Best Practice: Develop payment delay assumptions based on historical client data. Track each client's average payment time from invoice submission to payment receipt. Use these averages in your forecasting model rather than assuming payment occurs on standard terms. This single improvement dramatically increases forecast accuracy and prevents unpleasant surprises. For more on understanding financial metrics, explore our explanation of cash vs profit.

Forecast Monitoring and Updating

Static forecasts quickly become obsolete in construction's dynamic environment. Implement weekly forecast reviews where you compare actual cash flows to projections, update payment timing based on current information, incorporate new projects awarded, remove completed projects, and adjust for scope changes or delays. This rolling forecast approach maintains accuracy and provides early warning of emerging cash flow challenges.

Scenario Planning

Beyond baseline forecasts, develop scenario models for various contingencies. What happens to your cash flow if your largest client delays payment by 30 days? How does a significant change order impact working capital needs? What if material costs increase 15%? Scenario planning allows you to prepare contingency responses before crises occur, including pre-negotiating bridge financing facilities, identifying which projects could be delayed, determining which expenses could be deferred, and establishing client communication protocols. Learn about advanced financial planning techniques in our guide to creating investor-ready financial models.

Technology Tools for Cash Flow Management

Modern technology dramatically improves construction cash flow management capabilities. Construction-specific software solutions automate many previously manual processes, provide real-time visibility into cash positions, and generate actionable insights that improve decision-making.

Construction ERP Systems

Comprehensive construction ERP (Enterprise Resource Planning) systems integrate project management, accounting, and cash flow forecasting in a single platform. Leading solutions like Procore, Sage 300 Construction, Viewpoint, and Foundation Software provide project-level cost tracking, integrated billing and collections, subcontractor payment management, retention tracking, and cash flow forecasting capabilities. While these systems require significant investment and implementation effort, they provide the foundation for sophisticated cash flow management in mid-to-large construction firms.

Specialized Cash Flow Tools

For contractors not ready for comprehensive ERP investment, specialized cash flow tools provide targeted functionality. Solutions like Float, Pulse, and Dryrun integrate with accounting software to provide cash flow forecasting, scenario modeling, and what-if analysis. These tools cost significantly less than full ERP systems while delivering substantial cash flow visibility improvements. To understand how AI is transforming financial operations, read about AI finance software.

Payment Acceleration Technology

Technology can also accelerate payment receipt. Electronic invoicing and payment systems like Bill.com or Stripe reduce payment processing time by days or weeks compared to paper invoicing. Some contractors report 40-50% reduction in average payment cycles after implementing electronic invoicing. Mobile payment acceptance allows you to collect payment immediately upon job completion for smaller projects or change orders. Automated payment reminders integrated with your invoicing system improve collection rates without requiring manual follow-up effort. For insights on selecting the right financial tools, see our KPI selection framework.

AI and Machine Learning Applications

Emerging AI and machine learning technologies offer powerful cash flow management capabilities. Predictive analytics can forecast payment timing based on historical patterns more accurately than simple averages. Anomaly detection algorithms identify unusual payment delays or cost overruns before they become critical problems. Natural language processing can analyze contract terms to identify cash flow risks in new projects. While these technologies are still emerging in construction applications, forward-thinking contractors are beginning to implement them with promising results. Discover more about Xero AI capabilities and compare AI vs Excel for financial management.

Frequently Asked Questions

1. What is the biggest cash flow challenge in construction?
The biggest cash flow challenge in construction is the timing mismatch between when contractors must pay for materials, labor, and subcontractors versus when they receive payment from clients. Most construction contracts involve 30-90 day payment terms with additional retention holdbacks of 5-10%, while contractors must pay subcontractors within 15-30 days and often pay material suppliers even faster. This creates a negative cash conversion cycle where businesses need substantial working capital to bridge the gap between expenses and revenue receipt. On long-duration projects, this gap can extend for months, requiring careful cash flow management and often external financing to maintain operations.
2. How can I improve my construction company's cash flow quickly?
The fastest ways to improve construction cash flow include: accelerating your billing cycle by submitting progress invoices more frequently (weekly or bi-weekly instead of monthly), implementing electronic invoicing to speed payment processing by 7-14 days, negotiating advance payments or mobilization payments equal to 10-20% of contract value at project start, factoring high-quality receivables to convert 80-90% of invoice value to cash within 48 hours, and extending payment terms with suppliers and subcontractors where possible without damaging relationships. Additionally, focus collection efforts on aged receivables over 45 days, as these often require personal attention from senior management to resolve. Many contractors see 20-30% cash flow improvement within 30-60 days by implementing just these basic strategies.
3. Is invoice factoring worth it for construction companies?
Invoice factoring can be extremely valuable for construction companies when used strategically, despite costs of 1.5-3% per month. The key is comparing factoring costs to project profit margins and the value of immediate cash access. For example, if a project has 20% gross margins and factoring costs 2%, you still net 18% margin while eliminating payment delays and collection risks. Factoring provides particular value when: funding rapid growth that traditional financing can't support, managing seasonal fluctuations in construction activity, bridging large payment gaps on major projects, or working with new clients whose payment history is unknown. The strategic benefits—immediate cash certainty, outsourced collections, scalable funding, and no balance sheet debt—often justify the cost premium over traditional financing, especially for growing firms.
4. How do I manage retention holdbacks without running out of cash?
Managing retention holdbacks requires multiple strategies working together. First, negotiate reduced retention percentages (aim for 5% or lower) or implement retention caps at fixed dollar amounts. Consider substituting retention bonds for cash holdbacks—while bonds cost 1-3% annually, the improved cash flow often justifies this expense. Structure your pricing and project selection to account for retention timing, ensuring your working capital can absorb the delayed receipts. Create separate financial forecasts that track retention by project and expected release dates. For companies managing multiple projects, cumulative retention can exceed 20-30% of annual revenue, making it essential to plan for this capital requirement. Some contractors establish dedicated credit facilities specifically for funding retention holdbacks, treating it as a planned financing need rather than hoping to manage it from operating cash flow.
5. What cash flow forecasting tools work best for construction companies?
The best cash flow forecasting tools for construction depend on company size and sophistication. Large contractors benefit from comprehensive construction ERP systems like Procore, Sage 300 Construction, or Viewpoint that integrate project management, accounting, and cash flow forecasting. Mid-sized contractors often achieve excellent results with specialized cash flow tools like Float, Pulse, or Dryrun that integrate with existing accounting software (QuickBooks, Xero, etc.) and provide 13-week rolling cash flow forecasts, scenario modeling, and what-if analysis at much lower cost than full ERP. Smaller contractors can start with customized Excel or Google Sheets templates that track project-level cash inflows and outflows, though these require more manual effort. Regardless of tool sophistication, forecast accuracy depends more on discipline—weekly updates, realistic payment delay assumptions based on historical data, and scenario planning for potential issues—than on software features. Start simple and increase complexity as your forecasting process matures.

Conclusion: Building Sustainable Construction Cash Flow

Effective construction cash flow management requires a comprehensive, proactive approach that addresses all aspects of the cash conversion cycle. From negotiating favorable billing terms and retention provisions to implementing strategic bridge financing and factoring solutions, successful contractors employ multiple tools simultaneously to maintain healthy working capital positions.

The construction industry's inherent cash flow challenges—progress billing delays, retention holdbacks, and subcontractor payment timing pressures—will always exist. However, contractors who master cash flow forecasting, leverage appropriate technology tools, and maintain discipline in financial management can transform these challenges from threats into competitive advantages. The ability to take on larger projects, negotiate better terms with suppliers, and weather industry downturns separates financially sophisticated contractors from those who struggle despite profitable operations.

Remember that cash flow management is not a one-time fix but an ongoing process requiring constant attention and refinement. Regularly review your cash flow forecasts, analyze payment patterns, evaluate financing relationships, and adjust strategies based on changing business conditions. The investment in robust cash flow management systems pays dividends through reduced financing costs, increased bonding capacity, better vendor relationships, and ultimately, a more valuable and resilient construction business.

Partner with CFO IQ for Expert Construction Financial Management

Don't let cash flow challenges hold your construction business back. Our experienced team understands the unique financial pressures facing contractors and can help you implement proven strategies to stabilize cash flow, secure appropriate financing, and position your business for sustainable growth.